Do You Need a Deck Permit on Whidbey Island?

Most decks on Whidbey Island need a building permit. Outside city limits, Island County lets a deck skip the permit only when it passes four exempt-list tests. A deck fastened to the house fails one of them. So does a deck more than 30 inches above grade, or one over 200 square feet.

Langley, Coupeville and Oak Harbor are the exceptions: each runs its own building permits inside its limits. As a custom deck builder on Whidbey Island, we prepare and submit the permit set for the decks we build. The county or the city reviews that set and makes the call. Rules change, so confirm the details with the county or your city.

What are the four tests for a permit-exempt deck in Island County?

The county’s list is its copy of the 2021 residential code’s exempt-work section, R105.2. A deck needs a permit unless it passes every test below.

TestThe deck passes only ifA common way to fail it
SizeIt is 200 square feet or lessA 12 by 20 foot deck is 240 square feet
HeightNo point sits more than 30 inches above gradeA lot that slopes away under the deck
AttachmentIt stands free of the houseA ledger bolted to the house wall
Exit doorIt does not serve the exit door the code requires (R311.4)The required exit door opens onto the deck

The county’s list says that skipping the permit never makes it OK to break the code or other local laws. Shoreline rules can still reach an exempt deck, so check the lot first.

Which office issues the deck permit for your address?

It depends on whether your lot sits inside a city limit. If it does not, Island County issues the permit. The county has offices in Coupeville and at the Camano Annex.

Where the deck isWho issues the permit
Whidbey Island, outside the city limits listed hereIsland County
Camano IslandIsland County, which has an office at the Camano Annex
Inside Langley city limitsCity of Langley
Inside the Town of CoupevilleTown of Coupeville, through its SmartGov online portal
Inside Oak Harbor city limitsCity of Oak Harbor Building Division
Inside Anacortes city limitsCity of Anacortes
Unincorporated Skagit CountySkagit County, as a residential Accessory Structure permit

North over the Deception Pass Bridge, we also work in Anacortes and the Skagit Valley. Inside a city’s limits, that city has jurisdiction. In unincorporated Skagit County, the county issues the permit.

Skagit County’s examples of exempt work include uncovered decks 30 inches or less from ground level. Even an exempt deck there has to meet setback distances from property lines. Our Skagit County building permit guide covers the rest.

What does Island County check besides the building code?

A county deck permit can also bring in land use reviews. Which ones apply depends on the lot.

  • Shoreline. County shoreline jurisdiction runs 200 feet back from the ordinary high-water mark. The same rules cover four lakes: Deer, Goss, Lone and Cranberry. Building new, or altering the outside of an existing structure, generally needs county review and approval there.
  • Critical areas. A building permit application includes a completed Field Indicators Worksheet. That holds even where the property has no known critical areas.
  • Ebey’s Reserve. Ebey’s Landing National Historical Reserve takes in all of the Town of Coupeville. In the county’s design review areas there, most projects need review. The approval comes as a Level A, B or C Certificate of Appropriateness.

On a waterfront or Central Whidbey lot, ask about these reviews before the deck design is final.

What does the code require of a permitted deck on the island?

The county’s deck handout carries the deck rules of the 2021 Washington residential code, WAC 51-51-0507. These shape a permitted deck on an island lot.

  • Footing depth: at least 12 inches below undisturbed ground.
  • Frost: Island County’s frost line depth is 12 inches. A deck attached to a frost-protected house needs frost-protected footings.
  • Ledger: flashing that keeps water off the house band joist, and no ledger supported on stone or masonry veneer.
  • Salt air: within 300 feet of a salt water shoreline, every fastener and connector must be stainless steel.
  • Guards: at least 36 inches tall, required where the deck sits more than 30 inches over the ground below.
  • Guard openings: no opening that lets a 4-inch sphere pass.

The handout is a guide for standard wood decks built from its tables. It says a Washington State licensed architect or engineer may be required in cases like these:

  • the deck has more than one level
  • the walking surface is more than 14 feet above grade
  • the deck carries a heavy object, such as a hot tub
  • the deck bears on a steep slope

A bluff or hillside lot can land on that list. If the lot needs an engineered deck, we coordinate the engineer and build to the stamped plan.

What does a deck permit add in Island County?

For the permit, the county values a deck at a set rate per square foot.

  • Deck or porch: valued at $25 per square foot.
  • Covered deck or porch: valued at $34 per square foot.
  • Technology fee: 3% added to the total permit cost.
  • After-the-fact permit: double the normal fee.

A 12 by 20 foot deck is 240 square feet, so its permit valuation is $6,000. With a roof over the deck, the valuation rises to $8,160. The county uses those numbers to set the permit fee, and they are not build costs.

Our Island County building permit guide lists the fee tiers. For build costs, see deck prices by material. For a deck inside Langley, Coupeville or Oak Harbor, ask that office for its fees.

Do you need a permit to replace an old deck?

Tearing off an old deck and building a new one puts the new deck through the same four tests. In the county, a replacement deck bolted to the house or more than 30 inches up needs a permit. Board-only repairs are a question for your permit office.

On a waterfront lot, a rebuild can count as exterior alteration of an existing structure, which generally needs shoreline review. Permitting the work after the fact costs double the normal fee in Island County. For the money side, see what it costs to replace a deck.

How do we handle the permit for the decks we build?

We draw each deck to the code, or to an engineer’s design when the lot calls for one. The permit set shows the footings, the ledger flashing, the hardware and the guards. We submit it, and the county or city reviews it. In the county, inspection requests then go through the Island County Public Portal.

A deck is sometimes part of a bigger job, such as new siding on the same wall. As your general contractor, we hold one contract and one schedule for the deck and the rest of the work.

Based in Langley on South Whidbey Island, we build ironwood and composite decks across the island. Call or text (360) 544-9027 for a free estimate.

Frequently asked questions

What are the deck permit requirements in Island County?
Outside city limits, a deck needs a permit unless it passes four tests: size, height, attachment and exit door. A permitted deck is then built to the county's deck handout, which carries the 2021 Washington code for decks. Waterfront lots can add shoreline review. Inside Langley, Coupeville or Oak Harbor, ask that city or town.
How big can a deck be without a permit in Island County?
No bigger than 200 square feet, and size is only one of four tests. The deck also has to stay within 30 inches of grade at every point and stand free of the house. It cannot serve the exit door the code requires, either. Miss any one test and the deck needs a permit.
Does a deck attached to the house need a permit?
Yes, in unincorporated Island County. The county's exempt list only covers decks that are not attached to a dwelling. Its deck handout also calls for flashing at the ledger to keep water off the house band joist. Inside Langley, Coupeville or Oak Harbor, confirm with the city or town.
Do I need a permit to replace an old deck?
Plan on one when the new deck fails any of the four tests, the same as a first-time deck. On a shoreline lot, the county generally reviews exterior alteration of existing structures as well. Ask your permit office about board-only repairs before work starts.
What happens if you build a deck without a permit?
Island County charges double the normal fee for an after-the-fact permit, the permit for work done without one. The 3% technology fee still gets added to the total permit cost. Check with your permit office before the first footing goes in.
How much is a deck permit in Island County?
For the permit, the county values a deck at $25 per square foot, or $34 if it is covered. It sets the permit fee from that valuation, then adds a 3% technology fee. That valuation is used only for the permit, and the build cost is a separate number. Our Island County permit guide lists the fee tiers.
Is this what Culver Built charges for a deck permit?
No. The $25 and $34 figures are Island County's permit valuations, not our prices and not a fee total. For the decks we build, we prepare and submit the permit set, and the county or city decides. Call or text (360) 544-9027 for a free estimate.
Free Estimates

Get In Touch With Culver Built

Tell us about the lot or the house and what you want to build. You can also call or text (360) 544-9027 to set up a free estimate.

Get a Free Quote

Tell us about the job. We will get right back to you.

Call (360) 544-9027